My background spans construction trades, custom fabrication, CNC operation, and fabrication engineering. At Acoufelt, I focus on the connection between engineering and operations, technical standards and documentation, and developing the engineering team.
PROFESSIONAL HISTORY
Experience
Acoufelt
Auburn Hills, Michigan
Engineering Manager
February 2026 - Present
Strengthening the bridge between engineering and operations
Elevating technical standards and documentation
Building systems that scale
Developing and supporting a high-performing engineering team
Manufacturing Support Specialist
November 2025 - February 2026
Driving Continuous Improvement Through Engineering, Fabrication, and Lean Process Design
Brother CNC machine cleaning, light maintenance, and operation
Hand-tool use and following documented methods and procedures
Various Construction Companies
United States
Various titles in various trades
June 2005 - May 2016
Positions from laborer to project supervisor in concrete resurfacing and carpentry
Teamwork across different backgrounds, languages, and cultures
Continually improving and refining task processes
EDUCATION & TRAINING
Learning alongside the work
Grand Circus
Full stack JavaScript Bootcamp
September 2022 - December 2022
Started with HTML, CSS, and JavaScript, then Node. Most of the course work used React paired with TypeScript, with backend Web APIs, MongoDB, PostgreSQL, and Postman. Git/GitHub was used throughout, including branches and pull requests in group projects.
Analytical skillsProblem solvingCritical thinkingConcept developmentDesign and layoutProcess improvementWorkflow improvementPrototyping3D-printed toolingDesign-to-manufacturing translationFabricationCNC operationEngineering supportEngineering and operations coordinationTechnical standardsTechnical documentationLean process designClient communicationCollaborationAdaptability
These are transferable capabilities used across engineering, fabrication, operations, and independent project work. The experience above shows where they developed without limiting them to a single position.
Reported 90-day trial, retained grip, and $35 per-unit replacement versus the stated original $45–$65 range. Original photos, videos, drawing, and saved variants.
Room modeling, drawing production, and owner-documented project development.
A Fusion room model paired with the actual basement construction: exposed drains, supply lines, and the tiled shower that followed. The bathroom now exists in our house.